Project Summary (Excerpt)
The Yogi Operation is a large-scale iron ore magnetite project designed to produce high-quality magnetite concentrate. The mine will extract approximately 310 Mt of iron ore with a strip ratio of 1.7–1.9:1, supporting an annual mining rate of about 54 Mt. Around 20 Mt of ore grading 29–31% Fe will be processed each year to produce 5 Mt of premium magnetite concentrate grading 66–67% Fe with low impurities.
The processing plant will use two 2.5 Mtpa magnetite separation units, applying FIJV’s proven magnetite recovery technologies. Concentrate will be transported via slurry pipeline to the Port of Geraldton, with extensive water recycling achieving approximately 76% water recovery. The project has secured environmental and mining approvals as well as a water licence.
Project Description
The CAPEX for EX-Works product delivery is around USD 540 million
Investment Opportunity Details
The total investment amount will be returned after approximately 4.3 years.
The internal rate of return (IRR) is well above 20%.
項目資訊
專案亮點:
The total investment amount will be returned after approximately 4.3 years.
The internal rate of return (IRR) is well above 20%.
項目時程表:
預計開始日期:
01 July, 2027
預計結束日期:
30 December, 2030
融資輪次結束日期:
01 September, 2026