Project Summary
Gingerah Energy, partnering with the Karajarri Traditional Lands Association, the representative body corporate of the Karajarri People, is at the forefront of the energy transition by harnessing the natural resources of the Gingerah area with the support and wisdom of the Karajarri People. Project Meridien combines solar, wind, batteries and limited gas generation to power an AI training data centre up to one gigawatt capacity.
Traditional grid infrastructure is increasingly constrained. Large-scale, dedicated renewable energy precincts represent a necessary evolution in power delivery for compute-intensive operations. This land, situated in the locality of Gingerah hosts abundant natural resources including the earth’s heat, solar irradiation, wind and groundwater. Gingerah Energy together with the Karajarri People identified the opportunity to build the Gingerah Energy Hub, harnessing the natural energy resources of the Great Sandy Desert to provide the necessary digital infrastructure to meet global growing demands for large scale data processing facilities while minimising environmental impact.
The development of a gigawatt-scale renewable energy source, used for powering hyperscale data infrastructure, will provide firm renewable power and scalable data-centre capacity for sustainable economic growth.
Project Description
The International Energy Agency projects data centres to consume 1,000 TWH annually by 2030, while BloombergNEF forecasts growth to over 3,700 TWH by 2050, illustrating huge increases in electricity demand in future years. Project Meridien plans to pave the path in sustainable electricity consumption with its next-generation clean-energy and AI-infrastructure precinct delivered through a landmark partnership with the Karajarri People.
Developed by Gingerah Energy in partnership with the Karajarri Traditional Owners, the project has completed site characterisation and preliminary technical and commercial feasibility assessments over a secured 31,000 km² site, with direct access to the Indian Ocean for subsea fibre connectivity to Asia-Pacific markets. The site is capable of supporting renewable generation capacity sufficient to power a 1-gigawatt hyperscale AI campus, with long-term expansion potential, signalling multi-gigawatt expansion capability. The project is designed to deliver globally competitive, large-scale, renewable energy-backed compute capacity serving Asia-Pacific; the fastest-growing AI market and home to over half of the world’s population within overlapping time zones.
At the intended 1GW scale, the project would be around 100 times larger than typical metropolitan data centres currently operating in Australia, with modelling indicating a supply of power at almost half the cost of energy in Singapore. Project Meridien is targeting hyperscale cloud providers, sovereign AI initiatives and emerging AI compute platforms seeking secure, scalable and low-carbon infrastructure. The development will attract multi-billion-dollar capital investment and position Western Australia as a strategic hub in the global AI economy.
The project purports a scalable, off-grid AI and sustainable energy centre addressing the fundamental constraints of hyperscale expansion: Power Availability, Land Access, and Grid Capacity. The outline includes:
- Initial Phase – 100 MW hyperscale data centre with scalable architecture designed for AI and HPC workloads.
- Expansion Pathway – 1 GW+ IT load capacity scalable to multi-gigawatt renewable generation across 275 km² development zone.
- Firm Renewable Power – 24/7 supply of multi-gigawatt capacity using solar, wind and long-duration storage for dedicated, firmed power independent of grid constraints.
- Secured Site – 31,000 km² utilising an Indigenous Land Use Agreement with the Karajarri People provides land certainty and streamlined access across exceptional renewable resource area.
- Strategic Connectivity – ~55 ms to Singapore. Redundant fibre routes provide low-latency pathways to Singapore, APAC, Pilbara and other domestic markets.
- Infrastructure Ready – Integrated logistics access via ports, roads and airports with modular development approach for rapid deployment.
- Optimised for AI – PUE < 1.4 Closed-loop liquid cooling and efficiency-optimised design supporting high-density compute for hyperscalers and AI training.
- ESG Leadership – Partnership with Traditional Owners delivers long-term employment, training pathways, and culturally informed development.
- Sustainability – Harnessing the abundant renewable energy resources of the Gingerah region including solar, geothermal and wind energy, delivering a reliable, cost-effective energy source with the least environmental disturbance.
Investment Opportunity Details
Initial feasibility studies have been completed, and front-end engineering and design is expected to start soon. Gingerah Energy is progressing toward pre-FEED and environmental referral at State and Federal levels, with a target Final Investment Decision by 2029.
The project is seeking experienced strategic partners across energy generation, digital infrastructure development, fibre connectivity and AI compute platforms. Equity investment opportunities are available, with a minimum commitment of A$50 million to support detailed project definition, permitting and long-lead procurement. First-stage commercial operations are targeted for 2032, with full-scale development potentially reaching capacity by mid-2030.
Investor information
Financial information
Investment sought: $50 Million
Project website:
Project information
Project highlights:
We’ve completed feasibility studies and are currently engaging energy developers and datacentre developers as well as infra funds.
Project Meridien proposes a 1GW scale AI training facility powered with renewable energy (~15% gas firming).
Planning and Environmental approvals are due to be lodged this month.
Project CAPEX is estimated A$41b excluding chips and datacentre fitout. First phase of development will likely be 100 – 350MW (ie. A$5 – 15b)
The company Gingerah Energy Pty Ltd (ACN 681 120 892) is an incorporated joint venture between Fugro Australia, Longreach Renewable Energies and Karajarri Energy.
More Project details will be updated soon.
Request more information
Please fill in the form below. Mandatory fields are marked with
"*" indicates required fields